KILN

Home / Device assembly and packaging

Device assembly and packaging

Development builds of autoinjectors, needle safety devices and other drug-delivery devices, with assembly limits set from data and force and torque monitored on every unit, plus labeling, pack-out, kitting and packaging design.

Why development builds matter

Final assembly is where a prefilled syringe or cartridge becomes a combination product. The process loads the container and sets the positions that device function depends on.

If assembly limits are wrong, a needle shield can be disturbed, a flange can be stressed, or a device can leave the line outside its functional range. Programs also need assembled devices for development testing, human factors work and stability long before a commercial line is in place.

We build development quantities on fixtures designed to mirror your commercial line, with materials close to commercial construction where they touch the product. Limits come from characterization, and every unit is built and checked against them.

  1. FeasibilityMeasure insertion, break-loose, torque and snap-fit forces
  2. Set limitsLimits come from the data or are checked against yours
  3. BuildControlled speed, force and torque recorded per unit
  4. Check every unitGo / no-go fixtures and visual inspection
A typical needle safety device build: characterize, set limits, then assemble with checks on every unit.

What we do

Builds are run to your specifications, with the data to show every unit was made within limits.

Device assembly

Assembly of prefilled syringes and cartridges into drug-delivery devices.

Characterization and limits

Before any build, we measure the forces and torques each step needs: plunger rod insertion and break-loose, rod torque, syringe insertion into the device and finger flange snap-fit. The data sets the assembly limits, or is compared with limits you already have.

  • Force characterization
  • Assembly limits

Semi-automated assembly

Prefilled syringes are assembled into needle safety devices and autoinjectors on test-frame-based stations, with controlled speed and the resulting force or torque recorded for each step.

  • Controlled speed
  • Recorded forces

Checks on every unit

Rod torque and assembly forces are monitored on every unit. Go / no-go fixtures confirm plunger rod position, and each device is inspected for damage, correct activation features, and a syringe that turns freely and fits correctly.

  • 100% in-process checks
  • Go / no-go fixtures

Development builds

Devices built for development testing, stability and other studies, each traceable to its components and its build record. Syringes can be filled at Kiln first. See filling.

  • Development builds
  • Traceability

Process and packaging

Labeling, pack-out, kitting and packaging design, plus process support.

Process validation support

Where the process needs to be qualified, the inspection methods are validated and the assembly equipment is calibrated and qualified for speed, displacement, force and torque.

  • Inspection method validation
  • Equipment qualification

Labeling, pack-out and kitting

We can label assembled devices and filled containers, pack them out and kit them for development programs. We also design packaging and thermoformed trays.

  • Labeling
  • Pack-out
  • Kitting
  • Tray design

Distribution and transit simulation

Packaged product goes through environmental preconditioning and drop, compression, vibration, low-pressure and impact sequences, followed by functional and integrity testing.

  • ASTM D4169 sequences
  • Post-transit testing

Disassembly for testing

Validated disassembly methods free the primary container from an assembled device for container closure integrity testing without disturbing the seals.

  • Device disassembly
  • CCI

How we work

Work is structured in phases with clear deliverables at each gate, so you always know what you have paid for and what comes next.

  1. Scope

    We review the device, the container, your assembly specifications and how the samples will be used, and agree quantities.

  2. Fixture

    Fixtures and go / no-go gauges are designed and built to mirror your commercial line.

  3. Characterize

    Forces and torques for each step are measured on feasibility units, and assembly limits are set or confirmed.

  4. Build

    Devices are assembled within those limits, with every unit checked and recorded, then labeled, packed out or kitted as agreed.

  5. Deliver

    Units ship to you with the build records, or move into testing at Kiln.

Deliverables

Deliverables are defined in the proposal before work starts. A typical engagement includes the following.

Assembled devicesBuilt to your specifications in the quantities agreed
Build recordsForce and torque data and inspection results for every unit
Assembly limitsDerived from characterization, for specifying the commercial process
Protocol and certificateThe build protocol, batch data and a certificate of analysis

Related services

Filling and surrogate solutionsSmall-scale filling at nominal and process extremes, with matched surrogates
ISO 11608 testingDesign verification for pens, autoinjectors and other needle-based injection systems
Container closure integrity testingLeak test methods developed and validated under USP <1207> and ASTM F2391
Supplier survey and selectionSide-by-side comparison of container, device, CMO and CPO options
Devices we supportPrefilled syringes, cartridges, autoinjectors, pens, wearables and more

Questions we hear often

If yours isn't here, it's a good thing to bring to a consultation.

Which devices can you assemble?

We assemble prefilled syringes into needle safety devices and autoinjectors, and build other drug-delivery devices for development. Fixtures are designed around your specific device.

Why monitor force and torque on every unit?

Because assembly loads affect both the container and the device. Recording force and torque for every unit shows that each sample in a study was built within limits, and gives you the data to set limits for the commercial process.

How are assembly limits set?

By characterization. Before building study units, we measure the force or torque each step needs on feasibility units, then set limits from that data or compare it with limits you already have.

Can you fill and assemble in the same program?

Yes. Syringes and cartridges can be filled at Kiln, assembled into devices and then tested, so sample history is traceable from component to result.

Need devices built?

Tell us the device, the container and the quantities. We'll set up a call to talk through fixtures, limits and timing.

Prefer email? Write to info@kiln-lab.com or call +1 (866) 350-8240.